You've been thinking about this project for a while, and every builder you've called has been vague about two things. We're not. One hour at your house and you'll have a budget range out loud, before we leave.
Or call (555) 245-8800 — someone answers, including Saturday mornings.
Published, because you deserve to know before you spend an evening with a contractor. Where you land inside a range is mostly about selections — the same kitchen can be $30k or $70k.
$14k – $38k
Powder room to full gut with tile shower
$28k – $75k
Cabinets, counters, and the work behind the walls
$32k – $80k
Egress, framing, bath, and finishes
$85k – $250k
Foundation, framing, roof tie-in, mechanicals
Sample ranges on a concept site, in line with national remodeling cost guides. Your number comes from the consult.
We take a limited number of projects at a time on purpose. It's the reason your project lead picks up the phone in week six.
Free, about an hour, at your house. You leave with a real budget range.
An hour at your house. Scope, constraints, and a real budget range.
Drawings, allowances, and the selections that drive the price. Paid, and credited to construction.
Line-item scope and a fixed price. This is where you decide, with everything known.
Permit set submitted, materials ordered, and your start date locked.
One project lead, a weekly schedule update, and a job site that gets cleaned daily.
We walk it with you, fix the list, and hand over warranties and manuals.
You sign a line-item scope with a number. The only things that move it are changes you approve in writing.
Tile, cabinets, fixtures — each with a dollar allowance in the contract, so the showroom can't quietly rewrite your budget.
The same person from consult to punch list. You get their cell, not a general inbox.
Weekly update: what happened, what's next, what we're waiting on. Including the weeks when the answer is 'the inspector.'
Layout, cabinets, and the mechanical work behind the walls nobody sees.
$28,000 – $75,000Waterproofed properly, ventilated properly, finished beautifully.
$14,000 – $38,000More house — engineered, permitted, and tied in so it doesn't look added on.
$85,000 – $250,000Dry first, then framed — egress, ceiling height, and code handled.
$32,000 – $80,000Old houses brought forward without losing what makes them worth keeping.
Quoted per scopeOutdoor structures built to survive Michigan, not just to pass inspection.
$18,000 – $55,000Remodel leads don't come back twice. Ours get answered, scoped, and put on the consult calendar the same morning.
A homeowner finally calls about the kitchen. Three other builders' voicemails are already full.
A homeowner finally calls about the kitchen. Three other builders' voicemails are already full.
The front desk takes the project, the rough budget, and the timeline — the three things that decide fit.
Full gut, 1990s layout, $60–80k range, wants to start in spring. The project lead has it in writing.
Tuesday at 4pm is booked, confirmed by text, and prepped — nobody shows up cold.
We'll give you a range — the same ranges printed on this page. A fixed price needs drawings and selections, because 'a kitchen' spans $28k and $75k and the difference is almost entirely choices you haven't made yet.
Yes, and it's credited toward construction if you build with us. Free design isn't free — it's priced into the job, and it pressures you to sign with whoever drew it. You own the drawings either way.
A bath is typically 3–5 weeks, a kitchen 6–10, an addition 4–6 months. You get a written schedule with the proposal, and a weekly update against it.
Old houses always have something. We stop, show you what we found, and price the fix as a written change order before we proceed. No surprises added to the final invoice.